Steel formwork can replace wooden formwork, significantly reducing the elimination of pore water pressure and bubbles in concrete pressure that are usually associated with traditional sealing formwork such as wood, plywood, or steel plates; After the steel template structure concrete is poured and formed, an ideal rough interface is formed. No rough cutting operation is required to proceed to the next process of construction.
It can be placed either before or after the installation of the reinforcement. If it is placed before installing the steel bars, it is convenient and easy to place and install; Visual monitoring of the pouring process of concrete can be carried out to reduce the risk of phenomena such as pores and honeycomb structures.
More Information
![]()